Bellbowrie Aquatic Centre

This project entailed the removal of the old scum gutter and the building of a new wet deck attached to existing walls and base of the old pool to engineer’s specification. The main controller being supplied by AT Fluid Management.

Category

New Pool

Client

Brisbane City Council

Completed

11/2019