Fitness First 20m Indoor Heated Pool

Ozcrete was the primary contractor for the construction on piles of the Fitness First Robina 20m heated indoor wet deck lap pool. This covered surveying and set out of the pool in accordance to engineered plans, form work and boxing, setting of all penetrations, concrete spraying of pool shell, and balance tank, supply and installation of all plumbing and filtration systems including pumps and chemical dosing equipment, Metz Tiling system and wet deck edges and final hand over. This project was started on the 2/1/2005 and finished on the 17/10/2005.

Category

New Pool

Client

Fitness First

Completed

10/2005